SimpleCom provisioned bonded multi-gig circuits and hosts the bonding itself.
Client
Hyperscale data center operator
Industry
Technology & Cloud
Solution
Data center WAN bonding
Scope
2 multi-gig circuits, backup and OOBM
Hosting
SimpleCom-hosted bonding instance
Technology partners
Peplink
The challenge
A new build needs connectivity before anything else
Switches and hardware have to be provisioned on day one, long before permanent circuits are lit.
The operator also needed a lasting backup path and out-of-band management, which called for engineering and advanced routing.
The solution
Bonded multi-gig, ready on day one
SimpleCom delivered two bonded multi-gig circuits for backup internet and out-of-band management, with the bonding instance hosted by SimpleCom.
Day-one provisioning
Connectivity ready for switch and hardware setup at the start.
Two multi-gig circuits
Bonded for backup internet capacity.
Out-of-band management
A separate path to reach equipment when the main network is down.
SimpleCom-hosted bonding
One bill for all 5G carriers and one team running the gateway.
The result
Every device online and visible
All bonded devices are managed centrally, with 12 of 12 devices online and real-time status available to the operator’s team.
Building something that cannot wait for fiber?
One team to survey, install and support every site, on your timeline.